Building / Planning / Sports

New DOSB —
House of Sports 2.0

Type
Building, Planning, Sports
Time
2011—2012
Site
Frankfurt am Main
Client
Deutscher Olympischer Sportbund e.V.

The office space require­­ments of the German Olympic Sports Con­­fed­­er­­a­­tion (DOSB) exceed the exist­ing facil­it­ies in the Otto-Fleck-Schneise in Frank­­furt.

Bestandsbau
© PROPROJEKT
Bestandsbau
© PROPROJEKT
Bestandsbau
© PROPROJEKT
Bestandsbau
© PROPROJEKT

The cur­rent build­ing, used together with var­i­ous other sports asso­­ci­a­tions, 'Haus II', dating back to 1990, is out of date in terms of tech­no­­logy and energy-effi­­ciency and needs a major upgrade. For 'Haus I' which is used exclus­ively by the DOSB and dating back to 1971, upgrad­ing is not an option due to the poor space effi­­ciency. In this con­­­text, the DOSB is con­­sid­er­­ing an enlarge­­ment and a reor­­gan­isa­­tion of its facil­it­ies at the exist­ing site.

© AS+P – Albert Speer + Part­ner GmbH
© AS+P – Albert Speer + Part­ner GmbH
© AS+P – Albert Speer + Part­ner GmbH
© AS+P – Albert Speer + Part­ner GmbH

In pre­­par­a­­tion for the ten­der­­ing pro­­cess for the actual plan­n­ing, PRO­­PRO­JEKT was com­mis­­sioned with determ­in­ing the needs of the DOSB and plan­n­ing a pre­lim­in­ary rough draft. Together with the DOSB, a tailor-made space alloc­a­­tion plan was estab­l­ished, the desired qual­it­ies were decided upon and the total invest­­ment costs were estim­ated. Addi­­tion­ally, a pro­­posal for imple­­ment­a­­tion models was worked out.

Services

  • Determination of user needs
  • Estab­lish­ment of a space alloc­a­tion plan
  • Defin­i­tion of energy-effi­ciency and qual­ity stand­ards
  • Com­pil­a­tion of appro­pri­ate imple­ment­a­tion models
  • Estim­a­tion of total invest­ment volume

Credits / Cover

AS+P – Albert Speer + Part­ner GmbH